Kwinana Energy Transformation Hub (KETH)

Previously known as the LNG Futures Facility, the KETH will consist of:

  • 2 MW PEM (polymer electrolyte membrane) hydrogen electrolyser producing up to 800 kg/day of hydrogen
  • Fully instrumented 10 tonnes per day (tpd) small-scale LNG plant.
  • Broad range of testing facilities for third parties
  • Small scale LNG and renewable hydrogen facility
  • Sustainable certification and testing facility
  • Accessible, industrial-scale facility for trialling and de-risking innovative technologies
  • Highly instrumented live-plant training environment
  • Collaboration platform

Working towards Net Zero production processes